How Long Does It Take to Install Solar Panels?

How Long Does It Take to Install Solar Panels?

Installing solar panels on your property is not a quick process. While the physical installation itself can be completed in a day, there are several steps that need to be completed before and after the installation. It typically takes several months to go from choosing a solar installation company to having a working system on your property.

During the installation process, there are factors that can influence the timeline. These include the complexity of your system, location-specific challenges, market conditions, and backlogs at utilities and local government departments.

The first step is choosing a solar installer. Take your time with this step, as it is crucial. Research different companies, read reviews, and get multiple quotes before making a decision. It’s important to select a reputable and licensed installer.

After choosing an installer, a site assessment will be conducted. This can take about 1-3 weeks, as the installer will want to visit your property and assess any potential challenges or prep work that needs to be done.

The next step is designing and engineering your solar system, which typically takes about 2-14 days. This step is done by the solar company, and you should be given an opportunity to review and provide feedback on the design before finalizing it.

Acquiring permits is another important step, but timelines can vary based on local government. Your installer should handle this process, but it’s a good idea to inquire about the current timeline for permits in your area.

The actual installation of the solar panels usually takes 2-3 days, depending on the complexity of the system. Weather conditions can also affect the timeline. On installation day, it’s important to provide the installers with access to your roof, attic, breaker box, and utility meter.

After the installation, there is a final inspection and commissioning process, which can take weeks to months. This is where your installation will be reviewed by local permitting authorities and your utility, if you’re connecting your system to the grid. Approval from these authorities is required before your system can be activated.

It’s important to keep in mind that delays can occur throughout the installation process, and factors outside of your control, such as market conditions and permitting timelines, can impact the overall timeline. It’s best to be patient and work with a reputable installer to ensure a smooth and efficient installation.